List of Projects and Involvement:
Project | Roles & Project Involvement | Year |
APLNG Curtis Island Pipecom/Rignet |
The supply of surveying crews to this project. Duties include Control, Design Quantities, Redesign work, Model work, Working with GPS, aspects of Engineering set out and reporting. | 2015 Feb – May |
Logan Motorway, Section 1 Fulton Hogan
|
The supply of surveying crews to this project. Duties include Control, Design Quantities, Redesign, Model work, Working with GPS and Machine Guidance and all aspects of Engineering set out and reporting. Working with Paving crews and running conformance reports. Working with Main Roads. | 2013 Sept – 2014 Dec |
Logan Motorway Seymour Whyte/Boral
|
The supply of surveying crews to this project. Duties include Control, some project aspects of Engineering set out and reporting. Working with Paving crews and running conformance reports. Working with Main Roads. | 2013 April- 2014 Sept |
Darren Lockyer, Bridge Fulton Hogan |
The Supply of a Surveying crew to undertake all surveying associated works with Bridge construction and approaches. | 2013 Dec- 2014 Sept |
Warrego Highway Upgrade from Helidon to Withcott Fulton Hogan |
The supply of surveying crews to this project. Duties include Design Quantities, Redesign, Model work, Working with GPS and Machine Guidance and all aspects of set out and reporting. Working with Paving crews and running conformance reports. Working with Main Roads. | 2012 – 2013 |
Western Arterial Road Rehabilitation Project Boral |
To supply surveying crews to help with the construction and implementation of civil and road works associated with this project. This was a main roads project and we covered all survey aspects and reporting requirements. | 2012-2012 |
Airport Link Project. Downer EDi Works. |
Supply surveying crews to conduct levels over bitumen surfaces throughout the project. Work with paving crews on night and day shifts. | 2010- 2012 |
Pacific Hwy upgrade Nerang to Worongary, Gold Coast. Fulton Hogan |
Supply surveying Crews to this project. Each Crew are involved in all aspects of engineering set out requirements, reports and redesign work. Crews are working under live traffic. | 2010 – 2012 |
Gold Coast Light Rail project. GCUH Station. Leighton Contracting |
Supply all the surveying Resources as the principle site surveyors. All engineering set out and re designs. All reports and quantities. | 2010-2011 |
Carrara Stadium development, Gold Coast. McIlwain Civil.Stowe Electrical Christopher Constructions |
Carry out all the required survey tasks for the civil construction on this project. Carry out all engineering set outs for Drainage, roads, car parks and bulk earthworks. Carry out as constructed surveys and reports. | 2009-2011 |
Stapylton Concreting Batching Plant. BMD. |
To undertake all the survey set out requirements for the construction of this facility. Works included both civil and structural in nature. Redesign work and reports were also undertaken. | 2010 |
Mt Cotton Village.Stages G2, G4 and H1. Garry Deane Constructions |
Principle surveyor for each stage. Undertake all set out works and As-constructed surveys. Stage H1 required bridge set out work. All reports and quantities were also run. Pre quantities were also calculated. | 2010 |
North South Bypass Tunnel, Brisbane. CLEM 7. Landpartners PTY LTD. |
Running 4 crews. 3 on the South portal and the other on Shafston Ave. Crews and involved with the engineering set out requirements for each section, reports and redesign work. | 2008-2010 |
Western Corridor Pipeline Landpartners PTY LTD. |
To carry out set out works and redesign work (about 90%) for the construction of the Recycle Pipeline. Working with a combination of GPS and Terrestrial Survey equipment. To carry out as constructed surveys and service location details through the pipeline corridor. | 2008-2009 |
Seachange, Arundel. BMD. |
Carrying out the setout works for Roads, Services and bulk earth works. Volumetric and Quantities. Construction of 450 lots for a retirement village. | 2008-2009 |
Kessels Road, MacGregor. McIlwain Civil |
Carrying out engineering setout requirements for the construction of Roads and other civil services for Queensland Government Project Services. | 2008-2009 |
BP Chinderah. BMD. | Set out work for the construction of the new ramps into the new BP Service Station. Activities involved: Conformance reports, Volumetric and Quantities, S/O of roads, services, signs and line marking. | 2007 |
North South Bypass Tunnel, Brisbane.CLEM 7. Landpartners PTY LTD.
|
To carry out set out works for the construction of the South portal. This includes Bridges, bulk earth works, monitoring and pile work. | 2007 |
Wide Bay Hwy. Fat Hen Creek.
McIlwain Civil. |
Carry out the set out and conformance of 3km of new Highway, Bridge crossings etc. Run and maintain control network and work in with Machine Guidance Technology. Volumetric and Quantities | 2007 |
Riverlink Shopping Center. LEDA |
Set out works for the bulk earth works, Car parks, entry roads and services. Volumetric and Quantities. Re design was carried out during the project and was undertaken by PDM Surveys. | 2006-07 |
IKEA Centre. DELTA Group |
To carry out the S/O of roads, services, car parks, piles, pile caps, columns, earth works, retention basins, retaining walls, Volumetric and Quantities. | 2006 |